Summary of the Project
By Greengold CyberparkHoldings Corporation
1. Title of Project – Hyper Terminal Eastern Visayas
2. Undertaking of Feasibility Study – Master Development Plan Preparation and Construction
3. Project Proponent – Department of Transportation and Communications
4. PM/Consultancy CONSORTIUM LED BY THE GCHC
5. Categorization
a. Airport Development mixed Brown, Greenfield Construction, Terminal combined with Commercial Complex
b. Green Construction
6. Resources
a. External Sourcing for air nav technology, air traffic services, air traffic control, all equipage requirements as needed in Grant-in-Aid and Soft Loan
b. Philippine Government Initial Allocation of Philippine Pesos Five Hundred Million (PHP500,000,000.00)
e. Work Schedule
f. Purpose
The Study Component consists of the following three components:
a. Pre-Feasibility Study
b. Master Plan
c. Architectural, Structural Engineering, Design
d. Bill of Quantities
7. Key Responsible Agency
a. Subnational Government Agency, Local Government
b. Philippine National Government Agencies and Department of Transportation and Communications, Project Development Financing and Civil Works Component
c. Multi-Institutional / National Consortium led by GCHCORP - Consultant and Project Management to prepare Airport Hyper Terminal Plan
d. General Building Contractor (or Institution) Responsible for the Total Implementation of the Project
e. Civil Works Sub Contractor (or Institution) Responsible for the Project Activities on the ground
SCOPE OF WORK
a. Objective:
b. Location of Project: Eastern Visayas
c. Scope of Study
7.3-1 Basic Study
IMPLEMENTATION OF WORK
Stage 1. Pre-Feasibility Study of Terminal development Development
Stage 2. Project Master Plan Study of Terminal development
Stage 3. Technical and Financial Feasibility of Terminal development (Engineering and Financial)
Carrying out Pre-F/S level study and confirm the Master Plan objectives through final Technical and Financial Feasibility Full Report containing detailed engineering and financial final estimates and conclusions and incorporating the following aspects:
Additional Study of the following, if necessary
Other significant aspects of project that affect ecology
Especially Prepared and Submitted:
For
The Philippine Government
7. Key Responsible Agency
a. Subnational Government Agency, Local Government
b. Philippine National Government Agencies and Department of Transportation and Communications, Project Development Financing and Civil Works Component
c. Multi-Institutional / National Consortium led by GCHCORP - Consultant and Project Management to prepare Airport Hyper Terminal Plan
d. General Building Contractor (or Institution) Responsible for the Total Implementation of the Project
e. Civil Works Sub Contractor (or Institution) Responsible for the Project Activities on the ground
SCOPE OF WORK
a. Objective:
b. Location of Project: Eastern Visayas
c. Scope of Study
7.3-1 Basic Study
IMPLEMENTATION OF WORK
Stage 1. Pre-Feasibility Study of Terminal development Development
Stage 2. Project Master Plan Study of Terminal development
Stage 3. Technical and Financial Feasibility of Terminal development (Engineering and Financial)
Carrying out Pre-F/S level study and confirm the Master Plan objectives through final Technical and Financial Feasibility Full Report containing detailed engineering and financial final estimates and conclusions and incorporating the following aspects:
Additional Study of the following, if necessary
Other significant aspects of project that affect ecology
Especially Prepared and Submitted:
For
The Philippine Government